Station information
At the main church in Sonnborn (1922–26), a protruding support structure swings over the broad intersection and directs the suspension railway to the banks of the Wupper.
Zahlen, Daten, Fakten
30 m
Platform length
2
Elevators
2
Stairways
Land route
Location
313 m³
Reinforced concrete
510 m²
Glass surface area
Prof. B. von Chamier/F. Molina
Architect
ARGE Hein Vössing
General contractor
August 26th, 2002
Opened